Showing posts with label NPL. Show all posts
Showing posts with label NPL. Show all posts

Thursday, 16 February 2012

James: A week @ NPL: Day 4

I went in today to make the most of my last two days at NPL. Only to find my sample torn in two by the test rig having gone haywire in the night. Tragedy, or maybe not I know exactly what time, temperature and force it broke. So now I have a high temperature fracture surface to investigate.
So with extra data, although fortuitously, in hand I lay out the final few experiments required before I return to Bristol. I even found time to enjoy my lunch in the park by the River Thames, rather unseasonable 12 degrees in the Richmond area today.
So I left this evening my final over night run with far less apprehension than you may anticipate as even if it goes wrong I can still take something away from it.
One more sleep before the end of this little escapade.

Wednesday, 15 February 2012

James: A week @ NPL: Day 3

Today was somewhat a different day again. After sleeping on my results, not literally, I was confident that I knew what was going on and that with some straight forward tests when I get home next week I will ascertain if I'm right or not.
So I arrived at NPL to conduct my experiments totally unflustered and relaxed. And everything went as planned which left me at a little of a loss and to realise that it is quite difficult to procrastinate without the internet or friends around. Thus I got my head down and set about quite a boring day of writing.
Hope to give you something more interesting to read tomorrow.

Tuesday, 14 February 2012

James: A week @ NPL: Day 2

I found myself dragging my feet this morning, this was because after pondering over my experiment in the evening I felt that I only had one roll of the dice left before I may have to retreat home early with my tail between my legs.
So I pottered around doing any other job I could think of before testing my experiment again, eventually just before lunch I bit the bullet (before my sandwich). Amazingly it did something whether it had done what wanted was going to have to wait until after my lunch.
What I had change was the size of my samples, with thanks to the technicians at NPL. To give a little idea as to what I was up to, I was looking to conduct tests on metal samples to see how there resistivity changed with heat treatment but crucially this requires the sample getting hot when you put a high current through it. But yesterday when it didn't work the current density wasn't high enough thus making the samples smaller was an easy way to increase the current density running through the samples as I couldn't increase the current.
So the vital question when I came back from lunch what had happened? Well the exact opposite of what I expected! But as with all science any result is a positive one, you just have to understand what it means.
I have now also set one to run over night so we shall see what tomorrow brings.